

Complete Contamination Cleanup in 3-4 Months, Not Years
BioLogix® technology permanently eliminates soil and groundwater contamination on-site—no trucking, no backfill, no disposal fees. 100% regulatory approved.



Or Call: 1-780-962-7991

Traditional Remediation is Killing Your Budget and You Still Own The Liability
If you're comparing remediation options you already know the nightmare of sourcing backfill managing permits and manifests all while knowing that you're kicking a can down the road that your great-grandkids are going to deal with.
There's a better way—and it's already working for 100+ Companies.


Why Proactive Environmental Managers Choose BioLogix® Over Excavation

Minimal Site Disruption
Treat sites in-situ without disrupting your operations. No excavation means your business keeps running while contamination is eliminated beneath the surface.

Zero Transportation
Eliminate liability and costs of trucking contaminated material. Everything happens on your site with our mobile treatment process.

Permanent Solution
Complete degradation to CO2 and water in 3-4 months. No long-term monitoring, no rebound, no future liability.

Pre-Approved Process
NCP listed and DSL certified across Canada. Skip the permitting delays—we're already approved by federal regulators.

Minimal Site Disruption
Treat sites in-situ without disrupting your operations. No excavation means your business keeps running while contamination is eliminated beneath the surface.

Zero Transportation
Eliminate liability and costs of trucking contaminated material. Everything happens on your site with our mobile treatment units.

Permanent Solution
Complete degradation to CO2 and water in 3-4 months. No long-term monitoring, no rebound, no future liability.

Pre-Approved Process
NCP listed and DSL certified across Canada. Skip the permitting delays—we're already approved by regulators nationwide.

Real Projects. Real Results.

Title HYPREP Remediation Lot 3
Ogoniland Nigeria
Ogoniland Nigeria
Site Size 14,500 m3
Contaminant Type - Crude Oil
Remediation type - Soil

Diesel Petroleum UST Remediations
Multiple USA Locations
Multiple USA Locations
Site Size Range 1,250 sq ft - 5,000 sq ft
Average Pollutant Destruction
Remediation Type: Groundwater / Soil

Rapid Destruction of Hydrocarbons
Alberta, Canada
Alberta, Canada
Time On Site: 19 Days
Pollutant Reduction: 99%
Remediation Type: Water
See Why Companies Save 50-75% With BioLogix®

Cost Component
Traditional Landfilling
Delta BioLogix® Treatment
Excavation & Loading
$5-20/tonne
$5-$20 /Tonne
Transportation
$25-200/tonne
$0
Disposal Fees
$65-250/tonne
$0
Backfill
$25-50/tonne
$0
Treatment Cost
N/A
$30-$200
Total Cost
$120-520/tonne
$40-200/tonne
Timeline
1 month
3-4 months
Carbon Footprint
High (transport + landfill)
10X lower
Environmental Liability
100% liability remains
0% liability remains
Cost Component:
Traditional Landfilling:

Cost Component:
Traditional Landfilling:

Cost Component:
Traditional Landfilling:

Cost Component:
Traditional Landfilling:

Cost Component:
Traditional Landfilling:

Cost Component:
Traditional Landfilling:

Cost Component:
Traditional Landfilling:

Cost Component:
Traditional Landfilling:

Cost Component:
Traditional Landfilling:

Calculate Your Savings
Get Free Assessment
See BioLogix® Technology in Action
Remediation using next-gen microbes and field-tested tech:
Growing microbes on-site for faster, smarter, and more reliable cleanup:
Turning contamination into clean land using science, not landfills:
Your Path to Clean: Simple, Fast, Guaranteed



Canada's Leading Bioremediation Experts
After 100+ years of combined team experience and partnerships with 12 university research projects, we've perfected bioremediation. Our BioLogix® technology doesn't just move contamination—it eliminates it. Forever.

Robert Lacey BBA, EP
President

Scott Horan BCom
General Manager

James Ehizojie
Vice President (Biologist)

Joey Egeland BSc
Biologist

Valeria Trujillo BSc
Environmental Technician

Cassandra Lacey
Controller
200+
Successful Projects
Successful Projects
100+
Years Combined Experience
Years Combined Experience
5
University Research Partners
University Research Partners
Zero
Loss-Time Incidents
Loss-Time Incidents
Answers to Your Critical Questions
How long does BioLogix treatment take?
90-95% contaminant reduction typically occurs within 3-4 months. Timeline depends on contamination depth, soil type, and seasonal temperatures.
What contaminants can you treat?
Petroleum hydrocarbons (gasoline, diesel, crude), BTEX compounds, PAHs, chlorinated solvents, and many industrial chemicals. We'll confirm treatability during your free assessment with bench-scale testing if needed.
Is this approved by regulators?
Yes. BioLogix is listed on Canada's National Oil and Hazardous Substances Pollution Contingency Plan (NCP), which is approved for use in Canada, the USA, and 12 other countries. We have approval letters from every provincial regulator and have completed 200+ projects with full regulatory closure.
What's the cost per cubic meter or tonne?
Our treatment typically costs $40-200/tonne depending on contaminant type, concentration, and site conditions. Compare this to traditional excavation at $120-520/tonne (including all fees). Most clients save 50-75% while finishing 12-18 months faster.
What if leadership is skeptical of new approaches?
We provide references from companies like yours, site visits to active projects, and can arrange calls with environmental managers who've used both methods. Our assessment includes a detailed comparison to traditional methods with guaranteed pricing.
What about environmental impact?
BioLogix has a 10X lower carbon footprint than excavation and landfilling. No trucks, no emissions from transportation, and contamination is converted to harmless CO2 and water on-site.
Stop Overpaying for Contamination Removal
Get Your Free Remediation Assessment
What You'll Receive:
Confirmation of contamination levels and delineation
Regulatory compliance pathway for your province
Fixed pricing comparison vs. traditional methods ($40-130 vs. $120-520/tonne)
Timeline projection with seasonal considerations
Reference list from similar projects
"Even if we don't work together, you'll walk away with actionable insights for your remediation challenge. That's my promise."
— Robert Lacey, EP, President
— Robert Lacey, EP, President
Prefer to talk?
Call: 1-780-962-7991
Call: 1-780-962-7991